StoneCraft Epoxy Resurfacing

Why StoneCraft Floors Last

The truth about epoxy + polyaspartic systems — and why shortcuts cost you more

stonecraftstl.com

Not all garage floors are the same

You've probably seen ads promising a beautiful garage floor done in a single day for a low price. Here's what those companies don't tell you: speed and quality rarely share the same job site. StoneCraft uses a two-coat, two-visit system — epoxy base coat + polyaspartic topcoat — because that's what the chemistry requires for a floor that actually holds up for years, not months.


The StoneCraft process: what you're actually paying for

Phase What we do Time invested
Phase 1 Diamond Grind Prep Diamond-grind the entire concrete surface to open the pores. Remove oil, grease, old sealers, and high spots. This is the single most important step — adhesion lives or dies here. We also repair cracks and patch spalls before coating. 4–6 Hours
on-site
Phase 2 Epoxy Base Coat 100% solids epoxy is applied to the prepared slab. Epoxy is thick, penetrates deep, and bonds mechanically to the concrete. Decorative chips or flake are broadcast into the wet coat for texture and beauty. The coat must cure fully before topcoat — you cannot rush this. 2–3 Hours
application + cure time
Phase 3 Cure & Return Visit We leave the epoxy to cure properly (typically overnight to 24 hrs). This is non-negotiable. Applying topcoat over under-cured epoxy traps solvents, causes delamination, and voids the system. We return on a separate visit. Cure overnight
(protects your investment)
Phase 4 Polyaspartic Topcoat A premium polyaspartic topcoat is applied over the cured epoxy. Polyaspartic is UV-stable (won't yellow in sunlight), highly abrasion-resistant, and creates the hard, glossy finish that protects everything underneath. This is the armor layer. 1–2 Hours
application + final cure

Total hands-on labor per job: 8–12+ hours across two visits. Compare that to a one-day crew rushing in and out in 4 hours.


Why epoxy under polyaspartic — and not polyaspartic alone?

Property Epoxy Base Coat Polyaspartic Alone
(one-day systems)
Adhesion to concrete Exceptional — penetrates and bonds chemically Good surface bond only — does not penetrate
Film build / thickness Thick, fills surface texture, builds durability Thin — applies fast but lacks body
Flexibility Rigid base absorbs impact loads well Less rigid — micro-movement can cause cracking
UV resistance Yellows over time (covered by polyaspartic topcoat) UV-stable — correct as a topcoat, not as a base
Cure requirement Requires full cure before topcoat — no shortcuts Fast cure pushed as a feature, not a benefit
Long-term adhesion Two-coat bond = mechanical + chemical adhesion Single coat has no intermediate bond layer
Best role in a system Foundation / base coat Protective topcoat — not a standalone system

"Why are you more expensive?" — here's the honest answer

What you're comparing StoneCraft Epoxy + Polyaspartic System Cheaper one-day competitors
Prep method Diamond grinding — opens concrete pores Acid wash or light grind — surface only
Coats applied 2 coats (separate visits) 1–2 coats (same day, under-cured)
Cure between coats Full overnight cure — no compromise Hours or skipped entirely
Materials used Commercial-grade 100% solids epoxy + polyaspartic Consumer-grade or diluted coatings
Labor hours per job 8–12+ hours across two visits 3–5 hours in one visit
Expected lifespan 10–20+ years with proper care 2–5 years before peeling or flaking
Warranty confidence Stands behind the system Short warranty, hard to enforce
What you're buying A permanent floor — done right, done once A temporary fix that will need redoing

A cheaper floor isn't cheaper if you're paying to replace it in 3 years. StoneCraft charges for the labor, materials, and process that make a floor last — not for the fastest way to get out of your driveway.